ÁGUA AZUL - PA
Gold
The operation started its commissioning phase in 2023, with a Run of Mine annual capacity of 100,000 tons.
Gold
The operation started its commissioning phase in 2023, with a Run of Mine annual capacity of 100,000 tons.
Iron Ore
The complex consists in a hub of mineral assets, with potential resources, together they have more than 300 million tons of iron ore. Baratinha and Mongais are a part of the Complex and has the capacity to produce 3,5 million tons of high-quality iron ore annually.
Iron Ore
The project has potential resources of more than 1,6 million tons of iron ore. When finally reach the operation phase, it will have a Pellet Feed Fines production capacity with more than 70% of iron level and low levels of contaminants that serves the necessity to produce direct reduction pellets that are essentials to produce steel, with a significant reduction in CO2 emissions.
Phosphate
The project predicts to have a phosphate fertilizer production, a process route is in the development phase, alongside CETEM, in the Mato Grosso state, the biggest agricultural producer of the country.
Rare Earths
Located in the north-west region of Minas Gerais state, the Bambuí project has resources of more than 1 billion tons of rare-earths oxides with world class levels.
The medium levels are close to 0,40% of TREO (rare-earths total oxides), with regions performing levels of more than 1% TREO.
Iron Ore
The complex consists in a hub of mineral assets, with potential resources, together they have more than 300 million tons of iron ore. Baratinha and Mongais are a part of the Complex and has the capacity to produce 3,5 million tons of high-quality iron ore annually.
Rare Earths
Located in the north-west region of Minas Gerais state, the Bambuí project has resources of more than 1 billion tons of rare-earths oxides with world class levels.
The medium levels are close to 0,40% of TREO (rare-earths total oxides), with regions performing levels of more than 1% TREO.